GoSiteHunt

Energy & data-centre land finder: score any address for grid suitability

Data centres, solar farms and batteries all chase the same scarce thing — land near transmission and substations. Power Sites scores any address for all three use-cases in seconds, from real electricity-grid data, so you know which sites deserve a connection enquiry and which to walk away from. Screening only — proximity is a signal, not a guaranteed connection.

Start free — score an address →
Powered land is the new bottleneck

The build-out of AI compute, renewables and storage has turned one boring input into the deciding factor of an entire deal: distance to the grid. A data centre, a solar farm and a battery are three very different projects, but each one lives or dies on the same question — how far is the nearest substation, and what voltage is it carrying? Get that wrong and no amount of clever design saves the site. Get it right early and you are holding the scarcest asset in the energy transition.

The problem is that grid proximity is invisible on a normal property listing. A parcel that looks like ordinary rural or industrial land can be worth a multiple of its neighbours simply because a 132 kV line runs along the boundary — or worthless for energy use because the nearest connection point is thirty kilometres away. Developers, land bankers and agents burn days pulling grid maps, cadastre, terrain and zoning by hand just to answer that one question for a single address. Power Sites answers it from any address in seconds, and scores all three energy use-cases at once — so you screen the whole pipeline before you spend a dollar on consultants.

Check any address
One check = 1 credit (new accounts include free trial credits). Australia gets the full read — official Geoscience Australia grid data plus parcel, zoning and slope; other countries are scored on grid proximity from OpenStreetMap. Proximity is not capacity: connection headroom must be confirmed with the network operator.
Who develops these sites — and why proximity rules

Three buyer types compete for the same grid-adjacent land, each with a different tolerance and a different budget. Understanding what each one needs is the whole game of site selection.

Data-centre developers
Want transmission-class supply and large, flat, industrial-zoned parcels. The tightest requirement of the three — a marginal grid position kills the project outright, so screening ruthlessly for proximity matters most here.
Solar-farm developers
Need broad, gently-sloping rural land with a substation within reach and rural zoning that permits the use. More forgiving on parcel shape, but sensitive to slope and to the distance the connection line has to run.
Battery / BESS developers & land bankers
The loosest siting: a small parcel immediately adjacent to a substation can carry a battery. Adjacency is everything, which is why land bankers acquire grid-edge parcels ahead of demand and hold.

In every case the constraint is the same: the grid does not move. You can rezone, regrade and redesign a site, but you cannot relocate a substation. That is why proximity to transmission and substation infrastructure is the honest first filter — and why a fast, repeatable proximity score beats slow, one-at-a-time desktop research when you are working a real pipeline.

The numbers that decide a site

Power Sites reads the grid, cadastre and terrain around an address and turns them into a score out of 100 for each use-case. Below is how the underlying factors map to each energy format — a proximity-and-fit view, not a promise of capacity. Use it to understand why one address scores strongly for a battery but marginally for a data centre.

Siting factor Data centre Solar farm Battery (BESS)
Distance to substation Critical — closer is decisive Important — affects connection line cost Critical — adjacency is the whole case
Transmission voltage class Needs high / transmission-class Sub-transmission often workable Depends on the connection point
Parcel size Large, contiguous Broad footprint per MW Small parcel is fine
Slope / terrain Flat preferred Gentle slope needed Fairly tolerant
Zoning fit Industrial-leaning Rural / agricultural Flexible near infrastructure
Factor weightings are indicative and vary by use-case. A score reflects proximity and site fit from public data — not confirmed grid capacity. Australia adds parcel, zoning and slope from official sources; other countries are scored on grid proximity alone.
How developers, land bankers and agents use it
1
Score the site
Type any address — get data centre, solar and battery scored together, with the grid facts behind each number: nearest substation, its distance, voltage class, and (in Australia) parcel size, slope and zoning.
2
Shortlist by grid proximity
Rank a whole pipeline in an afternoon. Kill the marginal sites before you spend on consultants, and focus effort on the parcels the grid actually wants.
3
Verify the one thing screening can't see
Every result tells you what to confirm next — starting with available connection headroom at the substation, the single biggest deal-killer. Proximity gets you to the enquiry; the network operator confirms capacity.
How GoSiteHunt helps

Power Sites is one vertical inside GoSiteHunt — an instant property-development feasibility and site-finding platform that scores any address, in 35+ countries, in seconds. If your work spans more than energy land, the same account covers the commercial and residential stack:

The differentiator is coverage. Rival tools tend to be single-country, single-function or enterprise-priced. GoSiteHunt is global, end-to-end and instant — one platform that screens a data-centre parcel, a retail catchment and a residual land value from the same address bar, free to start on trial credits.

Pricing

Explorer

Free to start
  • Score sites with your trial credits
  • All three use-cases per check
  • Ideal for a landowner or agent checking one property
Start free
For developers & land bankers

Energy Operator

$499/mo USD
  • Unlimited site checks — no credits
  • Data centre + solar + BESS scores on every check
  • Official grid data in Australia, OSM worldwide
  • Cancel anytime
Own land near a substation?

If you hold a parcel close to transmission or a substation, you may be sitting on exactly what energy developers are hunting for. Check your address in the tool above — it is free to start on trial credits — and see whether it scores well for data centre, solar or battery use. A strong score is a signal the site could be worth taking to market. It is a screening signal only, not a valuation or an offer.

Score your land free →
Frequently asked questions

What does a Power Sites score actually measure?

It measures how close an address sits to real grid infrastructure — transmission lines and substations — plus parcel size, slope and zoning where available. The score is a proximity and site-fit signal for data centre, solar and battery use. It is not a guarantee of grid connection, capacity or approval; connection headroom must always be confirmed with the network operator.

Does a high score mean I can connect to the grid?

No. Proximity is not capacity. A strong score tells you a site is worth a formal connection enquiry because the infrastructure is nearby and the parcel suits the use — but the network operator decides whether spare capacity exists at that substation. Power Sites tells you which sites deserve that enquiry, not whether it will succeed.

Which countries does Power Sites cover?

GoSiteHunt scores addresses worldwide, wherever the electricity grid is mapped. In Australia the read uses official Geoscience Australia grid data plus parcel, zoning and slope. Elsewhere, sites are scored on grid proximity from OpenStreetMap data, so coverage depth depends on how well the local grid is mapped.

Who uses a data centre, solar and battery land finder?

Energy and data-centre developers screening land at scale, land bankers acquiring powered sites ahead of demand, and land agents or owners checking whether a grid-adjacent parcel is worth taking to market. Anyone whose deal turns on grid proximity can use it to shortlist fast.

How is this different from doing my own grid research?

Manually, screening one site means pulling grid maps, cadastre, terrain and zoning by hand — hours per address. Power Sites returns all three use-case scores and the grid facts behind them from any address in seconds, so you can rank hundreds of parcels before commissioning a single consultant report.

Can landowners use it too?

Yes. A landowner can check a single address free with trial credits to see whether it scores well for data centre, solar or battery use. A strong score is a signal the parcel may be worth taking to the market of energy developers hunting for grid-adjacent land.

Is the score financial or planning advice?

No. All outputs are indicative screening only, drawn from public grid, cadastre and terrain data. They are not valuation, planning, financial or legal advice, and grid connection, planning consent and land price are never guaranteed.

Screen your first energy site in seconds

Score any address for data centre, solar and battery suitability from real grid data. Free to start on trial credits — no card to try it.

Start free →
Scores are screening estimates from public grid, cadastre and terrain data — grid connection capacity, planning consent and price are never guaranteed. Distances are measured to the nearest mapped point of each asset. Not financial, valuation or planning advice. Grid data: Geoscience Australia (CC BY 4.0) in Australia; © OpenStreetMap contributors (ODbL) elsewhere. Pricing · Coverage · About · Contact · Terms · Privacy