523 homes approved in Castletroy — and a five-year delivery condition to watch
The Monaleen Road permission combines houses, apartments and childcare. Its issued conditions show why the final order deserves as much attention as the project headline.

Key takeaways
- Approved homes: 523
- Houses: 214
- Apartments: 309
A major residential permission for Limerick
An Coimisiún Pleanála signed a decision granting permission with revised conditions for 523 homes and a crèche at Monaleen Road, Castletroy, on 1 September 2026. The Large-Scale Residential Development appeal is recorded as case 324286, with Limerick City and County Council reference 2660241.
The scheme combines 214 houses with 309 apartments in ten apartment buildings. The inspector's report describes buildings ranging from two to five storeys and a net site area of 9.7 hectares. This is a mixed residential programme, with different housing forms occupying the same development site.
The condition behind the headline
The application sought a ten-year permission, as recorded in the inspector's report. The issued order instead gives five years for the permitted development to be carried out. It also requires a final phasing strategy to be agreed with the planning authority before commencement.
That difference is a useful reminder to read the approved order, not just the application description or an earlier programme. Dates and conditions should be checked against the document that actually grants permission.
Infrastructure shapes the usable site
The decision requires a minimum 6.5-metre wayleave corridor along an existing surface-water pipeline through the lands. It also includes environmental mitigation and service-connection requirements. Those details are part of the permission's implementation, even though they are less prominent than the overall housing count.
The scheme includes a crèche in an apartment building, parking, communal space and site services. The inspector's report sets out this broader development programme, which helps explain why the project should be studied as a neighbourhood rather than simply a collection of saleable units.
GoSiteHunt analysis: three things to carry into your own research
First, separate the proposed timetable from the permitted one. When reviewing an approval, create a short record of the actual duration, phasing requirements and milestones. Keep the source documents and dates beside that record. If the approved terms differ from earlier material, update the assumptions rather than relying on the document that is easiest to find.
Second, treat the housing mix as a set of products. Houses and apartments serve different needs and have different design characteristics. For a proposed project, research the comparable product by type, size and location instead of attaching one average figure to every dwelling. This case supplies a useful example of the distinction; it does not establish selling prices for either product.
Third, draw infrastructure requirements onto the working site plan early. A corridor, access route or service connection can influence where buildings and open space can fit. Keeping those constraints visible makes conversations between the planner, designer and civil engineer more productive, and helps identify which assumptions still need evidence.
These are GoSiteHunt's analytical takeaways from the published record. The verified milestone is the permission signed on 1 September; the sources reviewed do not establish that construction has commenced. Our next useful update would be evidence of an agreed delivery step or work starting, rather than another retelling of the same approval.
Read the official sources
Planning decision: . Source check: . Follow the original records for conditions, supporting documents and subsequent changes.
About this story. The decision facts above come from the named official sources. Sections labelled GoSiteHunt analysis are our interpretation. A permission is specific to its site and conditions; it does not establish what another property can build or confirm that construction has begun.
Found a material update or correction? Contact GoSiteHunt with the article link and source.