Skip to content
GoSiteHuntPlanning intelligence
IrelandBoherboy, Saggart, County DublinPlanning permission granted with revised conditions

Saggart’s 611-home Boherboy scheme clears planning appeal

The permission combines houses, duplexes and apartments with childcare, public open space and land reserved for a future school.

GoSiteHunt EditorialPublished 2 min readSources checked

AI visualisation based on a published Boherboy scheme illustration, showing homes and landscaped public open space. Not a photograph or approved plan.
AI visualisationAI interpretation of the published Boherboy design. It is illustrative and does not replace the approved drawings or planning conditions.AI interpretation of the published design. Not a photograph or an approved plan.AI visualisation: GoSiteHunt; illustration reference: Digital Dimensions · Project source ↗

Key takeaways

  • Permission for 611 homes was granted on appeal on 25 June 2026.
  • The scheme mixes houses, duplexes and apartments, with childcare and open space.
  • The school land is reserved; phasing and community obligations remain part of delivery.

What was approved

An Coimisiún Pleanála granted the Boherboy scheme permission with revised conditions on 25 June 2026. The 611 homes comprise 306 houses, 133 duplexes and 172 apartments. Apartment buildings reach up to five storeys.

The plan includes a childcare facility, approximately 2.3 hectares of public open space and a 1.03-hectare reservation for a future school. Reserved land is not a school construction approval.

Homes and services are linked

The permission requires agreed phasing and links occupation of specified apartment blocks to completion of the childcare facility, unless otherwise agreed. It also requires connections to adjoining lands and a €534,616.20 contribution towards a new community centre in the area. External finishes remain subject to agreement.

GoSiteHunt analysis: test infrastructure as well as yield

A large housing count brings delivery obligations. Phasing, drainage, movement links and community facilities belong in the feasibility assessment from the start. The planning grant establishes permission; it does not establish that construction has begun.

Read the sources

Planning decision: . Source check: . Follow the original records for conditions, supporting documents and subsequent changes.

  1. An Coimisiún Pleanála — decision record ↗pleanala.ie
  2. An Coimisiún Pleanála — signed order and conditions ↗pleanala.ie
  3. South Dublin County Council — application register ↗planning.agileapplications.ie
  4. South Dublin County Council — school-site context ↗meetings.southdublin.ie
  5. Application EIAR — project documentation ↗pleanala.ie

About this story. The decision facts above come from the named sources. Sections labelled GoSiteHunt analysis are our interpretation. A permission is specific to its site and conditions; it does not establish what another property can build or confirm that construction has begun.

Found a material update or correction? Contact GoSiteHunt with the article link and source.

Keep the next decision in view.

Follow GoSiteHunt for selected planning decisions and the practical lessons behind them. Or add Approval Watch to your RSS reader.